Fill in on screen, then print — or print blank and fill by hand

⚡ EV Charger Permit Application Worksheet

evchargerpermit.pages.dev — Fill out before visiting or calling your building department
FREE TOOL
💡 How to use this worksheet: Complete all sections before contacting your building department. Most jurisdictions ask for this exact information in their permit application. Having it ready speeds up the process significantly.
1. Property Information
Property Owner Name
Property Address
City, State, ZIP
Parcel / APN Number
Property Type
Single-family
Townhouse
Condo
Other
Owner Phone / Email
2. Contractor / Permit Holder
Who is pulling the permit?
Licensed electrician
Homeowner-builder (I am doing the work myself)
Contractor / Electrician Company Name
Electrical License Number
License Expiration Date
Contractor Phone
Contractor Email
Contractor Insurance Company / Policy #
3. Description of Work
Tip: Copy this sample description into the permit portal's "Description of Work" field and customize: "Install new dedicated 240V [AMPS]A branch circuit from main electrical panel to [LOCATION] for Level 2 electric vehicle supply equipment (EVSE). Circuit includes [GAUGE] AWG copper THWN-2 conductors in [CONDUIT TYPE] conduit, [BREAKER]A double-pole circuit breaker, and [OUTLET TYPE OR HARDWIRED]."
Your Description of Work (write out or use template above)
Charger Type
Level 1
Level 2
Installation Type
Plug-in (outlet)
Hardwired
Circuit Amperage
Wire Gauge
Wire Run Distance
Outlet Type (if plug-in)
4. Equipment Specifications
EVSE Manufacturer & Model
EVSE Max Output Amps
Is EVSE UL Listed?
Yes
No
Unknown
EVSE Has Onboard GFCI?
Yes
No
Conduit Type
EMT
PVC
Liquid-tight
None (NM-B)
Installation Location
Attached garage
Detached garage
Outdoor
Other
5. Electrical Panel Information
Panel Service Size
60A
100A
150A
200A
400A
Panel Brand & Model
Available Breaker Slots
Panel Upgrade Required?
No
Yes — subpanel
Yes — service upgrade
Estimated Project Value
Underground Conduit? (if detached)
Yes
No
Conduit Burial Depth
6. My Building Department / Permit Portal
Building Department Name
Permit Portal URL
Phone Number
Permit Application Submitted
Permit Number Issued
Permit Fee Paid
Inspection Date Scheduled